Technical data

36
13.0 Changing Components
© Baxi Heating UK Ltd 2012
13.13 Safety Pressure Relief Valve (Fig. 55)
1. Close the flow and return isolation taps and drain the
primary circuit.
2. For access remove the screws securing the
condensate trap, and pull off the pipe from the heat
exchanger. Ease the trap to one side.
3. Disconnect the discharge pipe from the pressure relief
valve and remove the sealing grommet.
4. Pull off the clip retaining the valve and withdraw it
from the outlet assembly.
5. Fit the new valve and ‘O’ ring seal and reconnect the
discharge pipe. Ensure the grommet is correctly refitted
to maintain the integrity of the case seal. Refit the
condensate trap.
13.14 Heating Pressure Gauge (Figs. 56 & 57)
1. Close the flow and return isolation taps and drain the
primary circuit.
2. Remove the gauge from the boiler lower panel.
3. Remove the clip securing the pressure gauge capillary.
4. Fit the new gauge, ensuring that the capillary is routed
to prevent any sharp bends. Reassemble in reverse order
and ensure the gauge is firmly in position to maintain the
integrity of the case seal.
Fig. 57
Heating Pressure
Gauge Capillary
Clip
Clip
‘O’ Ring Seal
Pressure Relief
Valve
Discharge Pipe
Control Box removed
for clarity
Fig. 55
Fig. 56
Heating
Pressure
Gauge