Technical data

11.0 Fitting the Outer Case
32
11.1 Fitting The Outer Case
1. Fit the outercase to the appliance ensuring
that the four slots in the side flanges align with
the hooks on the chassis (Fig. 48).
2. Insert the two fixing screws into the sides of
the chassis (Fig. 49).
3. Locate the lower door panel on the studs on
the case (Fig. 49).
4. Instruct the user in the operation of the boiler
controls. Hand over both the Users Operating
and Installation and Servicing Instructions,
giving advice on the necessity of regular
servicing.
5. Advise the user that a plume of vapour from
the flue terminal is normal, and that there is no
need for concern.
6. Advise the user that if intelligent pre-heat is
on, pre-heating will not occur for the first week
of operation.
7. Set the User preferences. See User Label on
lower door panel (Fig. 48) or users operating
instructions (set CH/DHW temperatures).
8. Carefully read and complete all sections of
the Benchmark Installation, Commissioning
and Service Record Log Book that are relevant
to the appliance and installation. The details of
the Log Book will be required in the event of any
warranty work. The Log Book must be handed
to the User for safe keeping and each
subsequent regular service visit recorded.
9. For IE, it is necessary to complete a
Declaration of Conformity to indicate
compliance to I.S. 813. An example of this is
given in I.S. 813 Domestic Gas Installations.
This is in addition to the Benchmark logbook.
Fig. 48
Fig. 49
Lower Door Panel
Outercase Fixing Screws
Lower Door Panel
User Label on back
of Lower Door Panel