Technical data

10.0 Completion
28
10.1 Completion
1. Hinge the facia panel upwards and refit the case
front panel. Tighten the securing screws (Fig. 38).
2. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
3. Carefully read and complete all sections of the
“Benchmark” Installation, Commissioning and Service
Record Log Book that are relevant to the appliance
and installation. The details of the Log Book will be
required in the event of any warranty work. The Log
Book must be handed to the user for safe keeping and
each subsequent regular service visit recorded.
4. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. In addition it is necessary to complete
the “Benchmark” Log Book.
5. Hand over the Users Operating, Installation and
Servicing Instructions and the Log Book, giving advice
on the necessity of regular servicing.
Fig. 38
Facia Panel
Case Front Panel