Technical data
13.0 Changing Components
36
© Baxi Heating UK Ltd 2006
13.3 Flowswitch (Fig. 47)
1. Drain the boiler (see Section 13.1 paragraph 2 & 3).
2. Remove the two screws on the support bracket.
3. Remove the clip securing the flow pipe to the
flowswitch.
4. Disconnect the inline electrical connection.
5. Pull pipe away from flowswitch.
6. Remove the two screws securing the flowswitch to
the boiler.
7. Remove the flowswitch.
8. Fit the new flowswitch and reassemble in reverse
order.
9. Recommission the boiler and check the inhibitor
concentration (see Section 6.2 and 10.1).
Flow Switch
Clip
Flow Pipe
Fig. 47
Support Bracket










