Technical data
11.0 Fitting the Outer Case – page 28
Fig. 40
Fig. 41
11.1 Fitting The Outer Case
1. Position the outercase on the chassis, ensuring that the
four slots in the side flanges align with the hooks on the
chassis (Fig. 40).
2. Insert the two fixing screws into the sides of the chassis
(Fig. 41).
3. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
4. Locate the lower door panel on to its hinges and gently
hinge up (Fig. 41).
5. Carefully read and complete all sections of the
“Benchmark” Installation, Commissioning and Service
Record Log Book that are relevant to the appliance and
installation. The details of the Log Book will be required
in the event of any warranty work. The Log Book must
be handed to the user for safe keeping and each
subsequent regular service visit recorded.
6. Instruct the user in the operation of the boiler controls.
Hand over the Users Operating, Installation and
Servicing Instructions and the Log Book, giving advice
on the necessity of regular servicing.










