Specifications

11
© Baxi Heating UK 2011
7.0 Installation of hydraulic station
7.1 Parts list
Before commencing the installation check all listed components
are contained in the following cartons.
Hydraulic Station carton:
1. Hydraulic pump station with insulation incorporating
wall mounting bracket.
2. Solar differential temperature controller.
3. Safety group, comprising-
Pressure relief valve, pressure gauge and fill &
drain valve.
4. 22mm compression fitting nut and olive(4 off).
5. Sensor extension cable (13m) (not shown).
Ancillary component carton:
6. Solar expansion vessel complete with mounting bracket
and strap assembly.
7. Expansion vessel connecting hose.
8. Expansion vessel self sealing connection.
1
2
3
4
Fig. 9 (Diagrams not to scale)
8
7
6