10.0 Installation
30
© Baxi Heating UK Ltd 2007
10.2 Preparing The Boiler
1. Remove the outer carton and packaging.
2. Lift the outercase upwards and remove.
3. Remove the internal packaging.
Lower Door Panel
Outercase
Fig. 22a
Break Off Upper &
Lower Pipe Run
Options
Internal Polysterene
Packaging Piece
Fig. 23