Instructions / Assembly
OPTIONAL: A second coat may be applied right away following the same
rolling pattern. Ensure that you do not lean on wet surfaces.
NOTE: Dispose of all unused materials and debris immediately after completing
the project. Obey all state, city, & town codes for proper paint disposal.
See "Safety" section at the end of these instructions for more details.
STEP 10: After allowing the coating to set for 24 hours, carefully
remove the tape by pulling at a 45 degree angle. Please allow
refinished surfaces to dry 48 hours before use. If caulk was removed
before resurfacing, reapply using 100% Silicone caulk once surfaces
are dry. Allow caulk to dry, and rinse refinished surfaces with warm
water before use.
DIY10
REFINISHING PRODUCTS
Thank You for Choosing
Please enjoy 10%* off your next total purchase made on our website:
bath-works.net
Using coupon code:
*Standard exclusions apply. 10% off total BathworksĀ® order. Offer valid only at https://www.bath-works.net. May not be
used in conjunction with any other coupon. Employees not eligible for discount. This offer may be modified by Tub
Refinishing Inc, DBA Munro Products, in its sole discretion without notice at any time.