Installation Guide
QCI0280 Page7 Cerfied6/27/14
5Insertawallplug[16]intoeachdrilledhole.Then
carefullycuttheheadsoffofthewallplugs[16]witha
razorblade.Sothereisnothingraisedabovethesur‐
faceofthewall.
Placetheu‐channel[3]inposionandsecure
itwith#8x1‐1/2”trussheadscrews[18].
6Place1/8”sengblocks[20]intotheU‐channel
asshownorapproximatelyevery18”.
DONOTplacesengblocksoverscrewheads,butset
themclosetoensurethatthescrewheadsarebelow
thesengblocks.
Note:Donotover‐ghtenthescrews.
Using suction cups set, the Stationary
Glass Panel into the U-channels on the
appropriate side. Use different sizes of
setting blocks to make exposed edges
of the glass level and plumb.**
Exposed edges MUST be level and plumb
before moving to next step.
**Different sizes setting blocks may be
required depending on level conditions.
Various sizes of setting blocks are provided
and can be used in different combinations
(stacked) to obtain the desired result.










