Installation Instructions

8
From the outside of the shower, lift the inner panel into place
with the rollers (and textured side of glass) facing you.
Lower it into the shower and then lift it into the header.
Be sure the bracket fins and rollers are above the track groove.
Carefully lower the panel until the rollers are seated into the groove.
Slide the panel to one side and repeat the steps, lifting the
outer panel into place.
Check for alignment along the bottom and sides of each panel
and adjust the rollers as necessary.
9 Slide one of the clear plastic discs
[R]
, then
a glass hole sleeve [K] onto the threaded back plate
[P]
.
Push the assembly through the hole in the glass panel
so that the glass hole sleeve is flush with the other side
of the panel. Slide the other clear plastic disc onto the
protruding threaded part of the back plate, and then
slide on the front plate
[S]
. Repeat this for the second
hole on the panel. While holding the towel bar [U] in
place, and screw the back plates into the towel bar. Use
the provided Allen wrench and the small hole drilled into
the side of the back plate to fully tighten the towel bars.
NOTE: Outer panel has towel bar facing Out.
Inner panel has towel bar facing In.
Refer to the diagram in step #1.
U
S
R
P
R
K
QCI5017 Rev. 3 Page 7 of 9 Certified 12/6/17
10
Locat e the nylon bottom guide in the
middle of the tub track with the glass panels in the
position shown. With a 7/64” bit, drill two holes into
the V - groove through the ounting holes in the guide.
Install the bottom guide with two #6 x 3/8” pan head
s crews thru the drilled holes as shown.
TUB
TRACK
GLAZED
PANELS
CENTER
GUIDE
INTERIOR
(2) #6 X 3/8
PAN HEAD
SCREW
PRO-TIP:
While the included screws are self drilling,
installation of the Guide Screws [W] can
be made easier with a pilot hole:
2) Mark the location of the screw holes on
4) Replace the guide and install the screws.