Installation Guide
INSTALLATION INFORMATION
3
4
A. Heater must be installed by a qualied electrician.
B. Place the heater on a rm, level ceiling surface; level ceiling surface; installaon of the heater on a
strong rigid support (such as strong wooden beams or metal rails etc).
C. The Hook on the ceiling hanging the Pao Heater must be able to take a weight 3 or 4 mes that of
the Pao Heater itself.
D. Place the Hook A around the Ceiling Hook and clip on any Ring of the Chain to adjust the height of
the Pao Heater to the Floor.
E. The distance between the boom of the Pao Heater to the Floor must be over1.8M.
F. Plug the Pao Heater into a grounded 110-120V power outlet.
G. Only operate the heater when it is in the upright posion.
Minimum Required Distances:
• 10 inches from the side wall
• 12 - 20 inches from the ceiling
• Installaon height above 70 inches
Technical specicaon
• Power supply 110-120V (50~60Hz)
• Waage max 1500w
• Insulaon class I