User's Manual

Integration Manual
BARTEC
Sheett 3/7
2. Assembly bottom housing
2.1 RFID/RuBee external Brick
1)
Drill 7 holes (1,0mm) and 4 holes (5,5mm) with the
fixture in the lower housing.
Press 4 inserts into the big holes.
2)
Lead the 7 wires (each with different colour) through the
drillings.
(LiY 0.08mm², d
iso
> 0.2mm)
3)
Fill the RFID upper housing with Sikaflex as shown in
the picture.
4)
Insert the pin with the hand strap into the recess.
Fix the pin with UV glue.
5)
Fix the RFID lower housing with 4 screws and 4
washers with the top housing of the mobile computer.