User guide

Poured Concrete Wall
Concrete Slab
Barrier-Bac
Vapor Retarder
Footing
Waterstops
Subgrade
Mastic
Grade
Barrier-Bac Vapor
Retarder and
Protection Sheet
Waterproofing
Membrane
Aggregate
Drainage system
Barrier-Bac
Seam Tape
When vertical wall is involved, please place the membrane butt end
on top of the footing and up against the vertical wall. is placement
method will provide the needed protection from outside moisture fol-
lowing construction completion.
VB Installation Guidelines 4
Step 3: On Top of the Footing
VB Products Installation Guidelines
IntePlus®  
IntePlus®  