VB Products Installation Guidelines
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 1A: Ground Surface Preparation : Earth Base Barrier-Bac should be unrolled to completely cover the pour area. Seams and/or joints can be joined using either BB20T Seam Tape or with heat welding. The film should be overlapped six inches side-to-side and endto-end.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 1B: Ground Surface Preparation : Aggregate Base Select the suitable Barrier-Bac product (VB-250, 11 mil or VB-350, 16 mil) and ensure the installation surface is relatively smooth. Although Barrier-Bac products are extremely tough, installation is easier and more effective when done over a smooth base. It is optional to have a layer of granular fill under the Barrier-Bac.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 2: Unroll and overlap Barrier-Bac should be unrolled to completely cover the pour area. Seams and/or joints can be joined using either BB20T Seam Tape or with heat welding. The film should be overlapped six inches side-to-side and end-to-end.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 3: On Top of the Footing When vertical wall is involved, please place the membrane butt end on top of the footing and up against the vertical wall. This placement method will provide the needed protection from outside moisture following construction completion.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 4A: Seal Penetrations - Round Penetrations All penetrations must be sealed with the Barrier-Bac and BB20T Seam Tape. For round pipe or posts, please seal penetrations with Pipe Boot. 18˝ – 1 – Measure a piece of Barrier-Bac Vapor Retarder membrane 18 inches in width and twice (two times) the circumference of the pipe. – 2 – Roll the measured piece of membrane in a roll form approximately the size of pipe.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 4B: Seal Penetrations - Square Penetrations All penetrations must be sealed with the Barrier-Bac and BB20T Seam Tape.For square posts, please seal penetrations with Block Out Seaming Methods. Cut corners approximately half the height of Block Out -1- Vertical seam tape Cut a piece of Barrier-Bac Vapor Retarder Membrane twice the height and one and one-half the length of the perimeter of the Block Out.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Step 5: Patch Damages and Pour Concrete All damages to the film must be sealed prior to pouring. Patch all damaged areas with Barrier-Bac and Seam Tape prior to concrete pouring. Concrete may be poured directly onto Barrier-Bac VB-250 (11 mil) and VB-350(16 mil). However, a sand or gravel cover is preferred. It is used at the discretion of the architect or in compliance with local building and regulatory codes.
IntePlus® IntePlus® xf film VB Products Installation Guidelines Other Drawings: Barrier-Bac Vapor Retarder under concrete slab to footing with pipe penetration detail Steel (mesh, grid, or rod) reinforcement Construction / Isolation joint Concrete floor slab Barrier-Bac Vapor Retarder Membrane Barrier-Bac Vapor Retarder Membrane Barrier-Bac Seam Tape Coarse compacted earth base * See details at pipe penetration VB Installation Guidelines 8
IntePlus® IntePlus® xf film VB Products Installation Guidelines Other Drawings: Barrier-Bac crawl space detail Termination Bar Barrier-Bac Vapor Retarder 2˝ fillet urethane mastic Subgrade (Earth Base) Footing VB Installation Guidelines 9