Installation Guide

6
Plumb and level second post and add concrete according to
manufacturer's instructions to top of post hole.
For panels that do not have pickets going above the top rail, add top rail to
pickets working from left to right. Once top rail is engaged with all pickets
snap top rail into both top post hole routes. Plumb and level second post and
add concrete according to manufacturer's instructions to top of post hole.
Check to ensure the second post is level , then add panel width plus one half the width
of your post. This will locate the center of your next hole. Then dig the third post hole
accordingly.
7
7
Center to Center Post Distance
6
6
a
6a6
6
6
b
6b6