Installation Instructions
SKU: 691-1247
UNIVERSAL PEDESTAL FLOAT SWITCH
Instructions - Removal of old switch
Risk of electrical shock. Can burn or kill. To reduce risk of electrical shock, disconnect power supply before replacing switch. Make
sure switch is connected only to a properly grounded grounding type receptacle.
Short circuit electrical hazard. An incorrect connection may cause electric shock, or burn out the pump motor, resulting in property
damage or personal injury. Make sure all connections are correct before plugging the switch into the outlet.
The outlet voltage and pump voltage must match. Ensure voltage is correct before installing switch. The electrical outlet must be
installed outside the pump basin.
Risk of flooding. It is recommended to operate the pump through two or three complete cycles to ensure proper liquid level control.
Installation Instructions - Barracuda Pump Replacement
1. Disconnect the pump power cord plug from the electrical outlet.
2. Remove oat ball and pull oat rod through old switch eyelet.
3. Remove switch mounng screws from motor.
4. It is recommended to mark or note all the wires before removing. This informaon
is required for steps 7-13.
5. Disconnect all four wire leads from switch.
6. Do not remove ground wire (E).
7. Aach white power-in lead wire (A) to terminal (1).
8. Aach black power-in lead wire (C) to terminal (3).
9. Aach white motor lead wire (B) to terminal (2).
10. Aach black motor lead wire (D) to terminal (4).
11. Re-aach switch to the motor with the original screws or with the screws
provided.
12. Reaach oat rod, oat ball and grommet.
13. Check switch operaon by lling sump with water and observing operaon
through one complete cycle.
Installation Instructions - Universal Pump Replacement
A
B
C
D
E
A
B
C
D
Top of
pedestal motor
A. White power-in lead wire
B. White motor lead wire
C. Black power-in lead wire
D. Black motor lead wire
E. Ground wire
A. White power-in lead wire
B. White motor lead wire
C. Black power-in lead wire
D. Black motor lead wire
E. Ground wire
7. Aach white power-in lead wire (A) to terminal (1).
8. Aach black power-in lead wire (C) to terminal (3).
9. Aach included white - motor jumper wire (F) to terminal (2). Aach the
other end of the jumper wire (F) to one of the two pump terminals (H) located
on the pump.
10. Aach included black - motor jumper wire (G) to terminal (4). Aach the
other end of the jumper wire (F) to one of the two pump terminals (H) located
on the pump.
11. Re-aach switch to the motor with the original screws or with the screws
provided.
12. Reaach oat rod and oat ball.
13. Check switch operaon by lling sump with water and observing operaon
through one complete cycle.
A
F
C
G
E
E
H
H
Top of
pedestal motor
Top of
pedestal
motor
A. White power-in lead wire
C. Black power-in lead wire
E. Ground wire
F. White motor jumper wire
G. Black motor jumper wire
H. Pump terminal