Installation Guide
Chapter 2 Installation
BarMate Installation Guide
9
Site survey overview
Before the BarMate system is installed, a site survey should
be completed by BarMate-trained personnel. The site survey
involves examining the installation site, and determining the
number of BarMate devices needed, where the devices
should be located, and how they should be mounted.
For example, the site survey should identify the number of
SRDs, SAMs, solar panels, Gateways, and MCs needed for
a particular site. Also, the survey should identify the type of
antenna arrays (square or linear) needed, and the cable
lengths necessary to connect devices. The survey should
also note where each device will be mounted and the
hardware and tools necessary to mount the device.
Information from the site survey should be recorded on the
site survey form located on page 4 of this guide. If more
space is needed to record information, additional pages can
be stapled to the site survey form.
►
Note: BarMate devices, such as SRDs, solar panels, and
antennas, include mounting brackets and screws.
However, depending on the requirements of a particular
site, additional hardware and tools may be required.
Any additional hardware and tools required for installation
should be noted on the site survey.
Installation overview
Each installation of the BarMate system will be based on the
BarMate site survey (see “Site survey overview” on page 4
and the site survey form on page 4).
This guide describes installation of a basic system. Refer to
the completed site survey form for the number of SAMs,
SRDs, and Gateways to be installed at a specific site. The
site survey also specifies the cable lengths required between
components and the approximate location where
components should be installed.