Instructions / Assembly
User’s Manual Page 7
Installation
Step 1
Step 2
Two people are recommended for this step; one
person to level the mount and another person to
mark the wall stud location.
1) Place the mount against the wall in the desired
viewing location.
2) Adjust the mount to align the mount slots in the
mount with the center of the wall studs.
3) Level the mount.
4) Use a pencil to mark the upper right mounting
location along the center of the wall stud.
Step 3
VW401P
Step 4
1) Insert one (1)
5
/
16
″ x 6″ lag bolt and one (1)
5
/
16
″
washer into each pilot hole
2) Tighten all lag bolts using a socket wrench and ½″
socket.
Do not overtighten the lag bolts when attaching
the mount to the wall. Improper installation may
result in personal injury or property damage.
2)Mounting to Solid Concrete/Masonry
Using a 3/8" (10 mm) masonry drill bit, drill 6 mounting
holes 3-1/8" (80 mm) deep into the concrete/masonry surface.
Two people are recommended for this step; one
person to level the mount and another person to
drill the pilot holes.
Drill a “pilot hole” in the center of each of the marks with
a power drill and a ¼″ drill bit.
Only use ¼″ drill bit when drilling the pilot holes.
M
K
L