User manual

78
Scheduling a task
To schedule a task:
1 In the Q/A setup window, right-click on the name of the task you wish
to schedule. A drop-down menu appears (see above).
2 Select the desired frequency from the Schedule > menu:
3 In the Select frequency window, select the time and, when
appropriate, day and month you wish the task to be executed.
Notes:
- After enabling and scheduling a task, it may still not appear as a due
task. The cause of this may be that the display(s) in the configuration
are not calibrated. Some tasks can be executed on calibrated displays
only.
- The moment that the task will be executed automatically, depends on:
the moment it becomes due
the trigger settings for this category of tasks
if a user is logged in on the workstation
Checking and changing task properties
You can display the task properties and change some of them.
There is a difference in properties between some of the tasks. Some of
them even have no properties.
Daily
The task becomes due every day at the scheduled time.
Weekly
The task becomes due every week at the scheduled time.
Monthly
The task becomes due every month at the scheduled
time.
Quarterly
The task becomes due every 3 months starting with the
scheduled time.
Twice a Year
The task becomes due every 6 months starting with the
scheduled time.
Yearly
The task becomes due every year at the scheduled time.