Installation manual
3. Installation of Screen Module
OverView D 50" – DOC-3303-5 – installation manual – Revision 11 – November 2006
________________________________
________________________________________________________________
_________________________________________________________
__________________________________________________
_________________________
3-12
Step12
The leveling of the upper border of that row
and the rows above is determined just by the
tolerance of the screen size which is very tight.
So the leveling should be already quite good.
In case there is still a small gap to the adjacent
screen, apply the leveling tape B195707,
covering the entire width!
Step13
Installation of the screens for all other rows are
identical to installing the screens of the second
row:
The screen above the static screen has to be
locked in horizontal direction, all other screens
must not be locked.
Take care that the screens are locked according their position!
Step14
When all screens are mounted, put all
horizontal movement screws into the plastic
bag (24 screws per bag) and fix these plastic
bags in the darkbox of the static screen using
the cable ties! In case the screens have to be
de-installed, these screws need to be applied
again!
Step15
Now the brushes have to be mounted.
The brushes serve as a light shield and close
the gap between the screen module and the
darkbox. They have to be glued on all edges of
the display wall..
They are flexible to allow the movement of
the screens.
The brushes are available in two lengths, one
matching the horizontal, the other matching
the vertical dimension of the screen module.
First clean the surface where the brushes have
to be fixed with alcohol to remove any grease!