Installation manual

2. Set up of OverView mD
OverView D 50" – DOC-3303-5 – installation manual – Revision 11 – November 2006
________________________________
________________________________________________________________
__________________________________________________________
____________________________________________________
__________________________
2-1
2 Set up of OverView mD
This section describes the set up of OverView mD
Two engineers are required to set up the system.
The room in which the installation is carried out should already have been cleaned.
The set up comprises the following steps:
Installation of supporting frame.
Installation of dark-boxes.
Installation of screen module.
Installation of illumination unit
Installation of projection unit
Optical adjustment