- VB-7313 series three-way mixing valves control hot or chilled water in heating or air conditioning systems. These valves must be...
- Danger: Do not use for combustible gas applications. The VB-7313 series valve packings are not rated for combustible gas applications, and if used in these applications, gas leaks and explosions could result.
- Features
- Applicable Literature
- . TAC Valve Products Catalog, F-27414
- . TAC Electric-Electronic Products Catalog, F-27382
- . TAC Pneumatic Products Catalog, F-27383
- . CA-28 Control Valve Sizing, F-13755
- . Valve Selection Chart for Water, F-11080
- . EN-205 Water System Guidelines, F-26080
- . Vx-7xxx-8xx, Vx-7xxx-59x, Vx-9xxx-8xx, Vx-9xxx-59x Globe Valve Assemblies with TAC DuraDrive Linear Series Actuators, F-26752
- SPECIFICATIONS
- VALVE SIZING AND SELECTION
- INSTALLATION
- Inspection
- Requirements
- Mounting
- 1. The valve should be mounted in a weather-protected area in a location that is within the ambient limits of the actuator. When...
- 1. Apply pipe dope sparingly to all but the last two threads of a properly threaded, reamed, and cleaned pipe. Make sure that pi...
- 2. Start the joint by hand screwing the pipe into the valve. If the thread engagement feels “right,” turn the pipe by hand as far as it will go.
- 3. Use a pipe wrench to fully tighten the valve to the pipe. Do not over tighten or strip threads. SeeTable-6 and Figure-3 for t...
- Table-6 Normal Thread Engagement Between Male Pipe Thread and Valve Body.
- Figure-3 Normal Thread Engagement.
- Figure-4 Installation of Screwed End Valves.
- TYPICAL PIPING
- CHECKOUT
- 1. Make sure the valve stem operates smoothly before installing the valve linkage and the actuator.
- 2. If the stem does not operate smoothly, it may indicate that the valve was twisted or crushed during installation or that the stem was bent by rough handling. These conditions may require that the valve be replaced.
- 3. After the piping is under pressure, check the valve body and the connections for leaks.
- 4. After the valve linkage and the actuator are installed, check their operation.
- a. Drive the actuator and run the valve to the stem down position. Make sure the linkage and valve stem move freely. At the stem down position, the valve should shut off the “B” port.
- b. Drive the actuator and valve to the stem up position. Again, the valve stem and linkage should operate smoothly. At the stem up position, the valve should shut off the “A” port.
- MAINTENANCE
- 1. Make sure the valve stem operates smoothly before installing the valve linkage and the actuator.
- DIMENSIONAL DATA
Printed in U.S.A. 10-07 © Copyright 2007 TAC All Rights Reserved. F-26074-2
TAC
1354 Clifford Avenue
P. O. Box 2940
Loves Park, IL 61132-2940
www.tac.com
Application
VB-7313 series three-way mixing valves control hot or
chilled water in heating or air conditioning systems.
These valves must be piped with two inlets (“A” and “B”
ports) and one outlet (“AB” port). They are used for
two-position or proportional control applications. Valve
assemblies require an actuator and a valve linkage that
must be purchased separately.
Danger: Do not use for combustible gas applications.
The VB-7313 series valve packings are not rated for
combustible gas applications, and if used in these
applications, gas leaks and explosions could result.
Features
• Valve sizes 1/2" to 2"
• 250 psig pressure rating per ANSI Standards
(B16.15–1985) for screwed cast bronze bodies
• Spring-loaded TFE packing
• American Standard Taper Pipe Thread (NPT)
connections
Applicable Literature
• TAC Valve Products Catalog, F-27414
• TAC Electric-Electronic Products Catalog, F-27382
• TAC Pneumatic Products Catalog, F-27383
• CA-28 Control Valve Sizing, F-13755
• Valve Selection Chart for Water, F-11080
• EN-205 Water System Guidelines, F-26080
• Vx-7xxx-8xx, Vx-7xxx-59x, Vx-9xxx-8xx,
Vx-9xxx-59x Globe Valve Assemblies with TAC
DuraDrive Linear Series Actuators, F-26752
VB-7313 Series
1/2" to 2" Screwed NPT
Three-Way Mixing Valves
General Instructions