Product Manual

Page 8 of 20
PREPARING FOR INSTALLATION
Unpack and inspect fan carefully to be certain all contents are included. Turn off power at fuse
box to avoid possible electrical shock.
DOWNROD INSTALLATION VAULTED CEILING INSTALLATION
Note: May require a longer downrod for high vaulted ceilings (sold separately).
MOUNTING BRACKET INSTALLATION