Product Manual

Page 12 of 23
4. Repeat for the right base and post assemblies.
Attaching Handles
1. Insert the handle (08C) INTO the left winch box (06C), and then tighten thescrew securely.
2. Repeat for theright winch box.
3. Once the assembly is complete, confirm that thecrane is solid and level, with all fourcasters on
the floor and the I-beam perfectly level. As needed, loosen one set of connections at a time
and make small adjustments with the help of an assistant so the crane is completely level.
Tighten every connection fully before moving on to another.