Manual
19
Banner Engineering Corp. • Minneapolis, MN U.S.A.
www.bannerengineering.com • Tel: 763.544.3164
SureCross Wireless Network
Product Manual
Basic Setup
Step 4: Verify Communications
On the Gateway
Verify LED 1 is on and green.
On the Node
Verify LED 1 is flashing green and LED 2 is off. Until communication is established with the Gateway, the Node’s
LED 2 flashes red. When communication is established, the Node’s LED 1 flashes green.
A Node will not sample its inputs until it is in sync with a Gateway.
LED 1 LED 2 Gateway Status Node Status
Green ON — Power ON
Green flash (1 per sec) RF Link Ok
— Yellow Flash Modbus Communication Active
— Red Flash Modbus Communication Error
Red Flash Red Flash System Error System Error
Red flash (1 per 3 secs) RF Link Error
When testing the Gateway and Node before installation, verify the Gateway and Node are at least two meters apart or the communications may
fail.