Manual

19
Banner Engineering Corp. • Minneapolis, MN U.S.A.
www.bannerengineering.com Tel: 763.544.3164
SureCross Wireless Network
Product Manual
Basic Setup
Step 4: Verify Communications
On the Gateway
Verify LED 1 is on and green.
On the Node
Verify LED 1 is flashing green and LED 2 is off. Until communication is established with the Gateway, the Node’s
LED 2 flashes red. When communication is established, the Node’s LED 1 flashes green.
A Node will not sample its inputs until it is in sync with a Gateway.
LED 1 LED 2 Gateway Status Node Status
Green ON Power ON
Green flash (1 per sec) RF Link Ok
Yellow Flash Modbus Communication Active
Red Flash Modbus Communication Error
Red Flash Red Flash System Error System Error
Red flash (1 per 3 secs) RF Link Error
When testing the Gateway and Node before installation, verify the Gateway and Node are at least two meters apart or the communications may
fail.