User Manual

Checkout Procedure Schedule
This section lists the schedule of checkout procedures, and describes where each procedure is documented. Checkouts must be per-
formed as describes, and results should be recorded and kept in the appropriate place (for example, near the machine, and/or in a tech-
nical file).
Schedule of Checkouts
Checkout Procedure When to Perform Where to Find the Procedure Who Must Perform the
Procedure
Trip Test
1. At Installation
2. Any time the System, the
guarded machine, or any
part of the application is
altered.
Trip Test on page 32 Qualified Person
Commissioning Checkout
1. At Installation
2. Whenever changes are
made to the System (for
example, either a new
configuration of the EZ-
SCREEN Type 2 or
changes to the guarded
machine.
Commissioning Checkout on page
38
Qualified Person
Shift/Daily Checkout
1. At each shift change.
2. Whenever the System is
powered up and machine
setup change.
During continuous machine run
periods, this checkout should be
performed at intervals not to ex-
ceed 24 hours.
Daily Checkout Card (Banner P/N
122450)
A copy of checkout results should be
recorded and kept in the appropriate
place (for example, near or on the
machine, in the machine's technical
file).
Designated Person or
Qualified Person
Semi-Annual Checkout Every six months following sys-
tem installation, or whenever
changes are made to the sys-
tem (either a new configuration
fo the EZ-SCREEN Type 2 or
changes to the machine).
Semi-Annual Checkout Card (Ban-
ner P/N 122451)
A copy of checkout results should be
recorded and kept in the appropriate
place (for example, near or on the
machine, in the machine's technical
file).
Qualified Person