User's Manual
SureCross™ DX80 Quick Start Guide
8 P/N 128185 Rev B
Banner Engineering Corp. • Minneapolis, MN U.S.A.
www.bannerengineering.com • Tel: 763.544.3164
Quick Start: STEP 4
> Verify Communications, Gateway
Verify LED 1 is on and green.
Verify LED 1 is flashing Green and LED 2 is off. Until communication is established with
the Gateway, the Node’s LED 2 flashes Red. When communication is established, the
Node’s LED 1 flashes Green.
Status LED 1 LED 2
Power ON Green ON —
System Error Red Flash Red Flash
Modbus Communication Active — Yellow Flash
Modbus Communication Error — Red Flash
Status LED 1 LED 2
System Error Red Flash Red Flash (1 per sec)
RF Link Ok Green Flash (1 per sec) —
RF Link Error — Red Flash (1 per 3 sec)
> Verify Communications, Node
If testing the Gateway and Node before installation, verify the Gateway and Node are at
least two meters apart or the communications may fail.