User Manual
97229 v.8.0 7
1. Before beginning the SpeedBrake 
installation, locate The Palm Tungsten 
E2 Power PDA in your kit. It will need 
to be charged for a minimum of one 
hour before the unit will function. 
Charge the unit with the supplied 
AC-outlet wall charger. The unit will be 
fully charged in one to two hours. 
2. Disconnect the negative (ground) 
cable from the battery (or batteries, if 
there are two) before beginning work. 
Secure the cables so that they do not 
come in contact with the battery posts 
during the installation.
3. Locate the Banks SpeedBrake wire 
harness in your kit. Start by placing 
the wire harness near the under hood 
fuse box. Run the Main Transmission 
intercepting connector wire harness 
on the SpeedBrake wire harness down 
to the transmission following the 
factory transmission main connector 
harness from transmission control 
module.
4. On the right side of the 
transmission locate the transmission 
main connector. See Figure 2. 
Disconnect the connector by applying  
pressure on both sides and pull out.
5. Insert the female connector on 
the SpeedBrake wire harness into the 
transmission connector. Insert the 
factory main transmission connector 
to the male connector on the 
SpeedBrake wire harness. 
NOTE: When installing the male 
connector to the transmission orient 
the arrow on the connector up.
6. Bend the heat shield as shown 
in Figure 3 to relieve tension 
from connectors and to allow the 
connectors to be positioned away 
from heat sources.
Figure 2  Main Transmission Connector Location 










