BAKERS PRIDE INSTALLATION AND OPERATING INSTRUCTIONS Cyclone SERIES GAS CONVECTION OVENS Models: BCO-G and GDCO-G INTENDED FOR OTHER THAN HOUSEHOLD USE. RETAIN THIS MANUAL FOR FUTURE REFERENCE. OVEN MUST BE KEPT CLEAR OF COMBUSTIBLES AT ALL TIMES. After the gas supply has been connected to your unit, it is extremely important to check piping for possible leaks. To do this, use soap and water solution or solutions that are expressly made for this purpose.
Table of Contents I. INSTALLATION INSTRUCTIONS SECTION A B C D E F G H I J ITEM PAGE Receiving Set Up / Mounting Installation with Casters (Optional) Location and Minimum Clearances Gas Connections Electrical Connection Flue Connection Ventilation Burner Operation System Check Rotary Control Programming Menus 2 3 4 4 4 5 5 6 6 6 II.
B. SET UP / MOUNTING: NOTE: This appliance must be installed by competent personnel in accordance with the rules in force. In the U.K., Corgi registered installers (including the regions of British Gas) undertake to work to safe and satisfactory standards. This appliance must be installed in accordance with the current Gas Safety (Installation and Use) Regulations and the relevant Building Regulations/IEE Regulations. Detailed recommendations are contained in the British Standard Codes of Practice B.S.
Fit the Standard Flue Diverter supplied into the hole in the top of the oven for under ventilation hood installation and secure with screws. For direct venting, FlueAdapter and Draft Hood must be placed into the hole on top of the oven. C. INSTALLATION WITH CASTERS (OPTIONAL): Four casters (two with wheel brakes) and the mounting hardware are packed and included in the shipment if ordered. Install casters with wheel brakes on the front of the unit.
The gas pressure regulator is part of the combination valve and is adjusted to yield a pressure of 3.5 water column (9 mbar) for Natural Gas. If the oven is ordered for use on Propane Gas or Butane, the pressure regulator in the combination valve is preset at the factory to yield a pressure of 10 water column (25 mbar). NOTE: No external regulator is required. Gas supply pressure in the European Community countries should be as below.
Optional direct venting (not available for European community countries): If direct venting, a flue adapter and a draft hood are required to be installed. They prevent the flue gases leaving the oven to be affected by the air pressure changes on the outside of the flue stack extending out of the building. The flue pipe from the draft hood must not run downwards at any point from the oven to the final outlet. It should always slant slightly upwards. For best results, is should rise straight up.
II. OPERATING INSTRUCTIONS A. GENERAL INSTRUCTIONS: (1) This equipment has an Electronic Temperature Control and Electronic Hot Surface Direct Ignition System. (2) Due to increased efficiency of this oven, the temperature of standard recipes may be reduced 50°F (30°C). (3) Always load each shelf evenly. Space pans away from each other and from sides and back of oven to allow maximum air flow between them.
Optional steam injection: Rotary control: The solenoid valve for steam injection is mounted behind the service panel on the right-hand side of the unit. The electronic timer is preset at the factory. A ¼ copper tubing is provided on the Solenoid Valve for water hookup with a compression fitting.After the water hookup is made, make sure that there are no leaks. For steam injection, press the Steam switch momentarily. NOTE: DO NOT USE STEAM INJECTION AT TEMPERATURES BELOW 275°F (135°C).
SINGLE-PHASE 120V WIRING DIAGRAM (PUSH-BUTTON CONTROL) 24 VAC 25 30 7 6 8 5 1 4 2 3 27 GREEN LIGHT 30 10 LOW 26 TIME DELAY RELAY 24 HIGH 29 BLACK WHITE 120V BUTT SPLICE 27 28 TRANSFORMER GROUND 4 POSTION SWITCH 9 YELLOW 20 24V BLUE P1 P2 P3 P4 42 34 41 15 21 GROUND STUD 15 RELAY 13 LIGHTS 44 36 35 38 37 T10 T11 33 IGNITION CONTROL DOOR SWITCH 32 PROBE T13 T12 CH104 CONTROL 17 16 GROUND STUD 6 8 PUSH BUTTON SWITCH S2 19 W 17 13 20 21 9 34 10
SINGLE-PHASE 120V WIRING DIAGRAM (DIAL CONTROL) HIGH 29 10 27 POWER LIGHT TIME DELAY RELAY 25 30 8 4 POS SWITCH 24 28 7 6 8 5 1 4 2 3 LOW 26 BLACK 120V WHITE BUTT SPLICE 9 P1P2P3P4 TRANSFORMER GROUND 32 T-STAT LIGHT 13 YELLOW BLUE CENTRIFUGAL SWITCH FAN MOTOR 24V PROBE IGNITION CONTROL T-STAT L1 S2 T6 T7 4 14 LIGHTS 6 36 7 3 4 4 34 NO 6 31 39 14 38 37 18 3 23 IGNITER 19 3 1 7 1 12 11 2 33 FLAME SENSOR 33 22 32 DOOR SWITCH 9 24 10 15 22
BAKERS PRIDE BAKERS PRIDE LIMITED WARRANTY 30 Pine Street New Rochelle, NY 10801 1-800-431-2745 914-576-0200 fax 914-576-0605 4/02 11
INTERNATIONAL DISTRIBUTION AND SERVICE CENTERS BAKERS PRIDE BAKERS PRIDE INTERNATIONAL 30 Pine Street New Rochelle, NY 10801 USA +1 (914) 576-0200 +1 (914) 576-0605 fax sales@bakerspride.com www.bakerspride.com RUSSIA Perfi, Ltd. — Dmitri Slavin 22 Marksistskaya Street Moscow, Russia 109147 +7 (095) 912 4100 +7 (095) 913 3553 fax dmslavin@hotmail.com 729 Third Avenue Dallas, TX 75226 USA +1 (214) 421-7366 +1 (214) 565-0976 fax info@apwwyott.