Installation Guide

20
Figure 4-5: SmartUPS Pole Installation
4.2.2 Wall Installation
When installing the SmartUPS on a wall, the wall must bear at least 4 times the weight of the
SmartUPS.
1. Take apart the assembled installation bracket kit.
2. Fit the mounting bracket on the wall and mark the drilling locations (Figure 4-6). Make sure
the arrow on the bracket is pointing upward.
Figure 4-6: Mark Drilling Locations
3. Drill (2) 10-mm diameter and 70-mm deep holes in the wall on the marked locations, and
insert the expansion pipes.
4. Check the up/down direction of the installation rack, and then fit the SmartUPS unit to the
wall bracket using the M8 x 80 expansion bolts.
5. Tighten the 2 screws on the top of the bracket using a cross screwdriver.
4.3 Connect the Power Cables
Review the AC and DC power cable specifications provided in Table 3-1. Since each installation site is
different, the installer must determine the appropriate length of the cables. The power adaptor is,
therefore, shipped with bare terminal ends. You will need to assemble the power plugs. The
following sections explain how to prepare and connect the input and the output power.
Baicells recommends keeping the power cable length under 330 ft (100m).