Installation Guide
15
3. Installation Preparation
3.1 Materials & Tools
You will need the materials and tools shown in Tables 3-1 and 3-2, respectively, to install the
SmartUPS.
Table 3-1: Materials
Item
Description
AC Power Input Cable
AWG16 shorter than 100m
DC Power Output Cable
AWG13 shorter than 50m
Ground Cable
5AWG yellow-green wire
Optical Fiber Cable
LC-LC SMF fsc-507, single-mode
Ethernet Cable
Outdoor Cat6 RJ-45 Ethernet cable
Table 3-2: Tools
Level bar
Marking pen
Knife
Pliers
Wrench
Percussion drill
and drill heads
Hammer
Cross screw driver
Cable vice (crimper)
Tape measure
5mm L-shaped
Allen wrench
Torx screw-driver
T7 screwdriver head
Cable Stripper
3.2 Placement Considerations
3.2.1 Environment
When determining where to place the SmartUPS unit, you need to consider factors such as climate,
hydrology, geology, the possibility of earthquakes, reliable electric power, and transportation access.
Refer to the technical specifications in
Appendix A, specifically concerning temperature and humidity