Specifications

Installation Data
CONNECT THE ORION REMOTE ENDPOINT TO A TWO-CONDUCTOR CABLE FROM
A METER OUTPUT
If connecting a endpoint to a pair of wires, determine the proper length of wire needed from the ORION remote
endpoint and from the pulser.
1. Trim about 3/4 inch of the outer sheath from both ORION wires. This exposes the two individual wires in each.
NOTE: Do not remove the insulation from these wires.
2. Insert the two ORION remote endpoint positive (+) polarity wires into a gel cap. Make sure the two wires are
inserted fully and seated in the gel cap.
A three-wire gel cap should be used with the negative (-) polarity wire of the meter output going to the black and
green wires of the ORION unit.
GAS RT CONNECTIONS
NOTE: For detailed instructions, see the Model GAS RT Installation Data sheet
If a Badger Meter gas RT (Recordall® endpoint) is used as the source of the signal, the wires are spliced into the
gas RT.
The gas RT is installed on the index cover face.
Gel-caps are provided for splicing ORION remote endpoint cables to gas RT cables.
Gas RT Cover
Gas RT
Gas RT Attached to
the Index Cover Face
Two-Wire Gel
Cap for gas RT
Red Wire and
ORION Remote
Endpoint Red
Wire
Three-Wire Gel
Cap for gas
RT Black Wire,
ORION Remote
Endpoint
Black Wire and
ORION Remote
Endpoint Green
Wire
Strain Relief
(4-11)
Page 15