Hardware Solutions for Gas Utilities User Manual

Installation Data
ORION INSTALLATION KIT FOR AN AMERICAN ROTARY GAS METER
IMPORTANT! Installation of the ORION integral endpoint onto an American rotary gas meter requires an
AMR adapter plate which is available from American Meter.
Use the American rotary meter installation instructions for dismantling the top portion of the meter.
The photos below show how the American gas meter looks before installation of the ORION integral endpoint with the AMR
adapter plate in place. If the adapter plate is already attached to the meter, remove the three (3) 10-32 Allen screws that hold
it to the meter.
Rotary Meter
Gasket
3 Nuts 1/4-20
Rear Gasket
Endpoint
3 Screws
1/4-20 x 3/8"
Front Gasket
4 Screws
8 -16 x 1/2"
Cover
4 Tamper Plugs
American AMR Adapter
Plate (not included in
installation kit)
(4-11)
Page 9