Hardware Solutions for Gas Utilities Owner manual

Installation Manual
AMERICAN METER INSTALLATION MATERIALS
Rear gasket
Endpoint
4 screws
1/4-20 x 3/8”
Front gasket
Index from
existing meter
2 screws #8-16 x 1/2” or
2 screws #8-16 x 1/4”
4 screws
#8-16 x 1/2”
Cover
4 tamper plugs
ASSEMBLE THE ORION ENDPOINT AND INDEX
Endpoint Gaskets Attachment
The gaskets should be attached to the endpoint at the factory. If the gaskets are not attached:
1. Place the rear gasket on the back of the endpoint. Place the rear gasket so the tab is at the top of the endpoint, the drain
slots are pointing down, facing towards the gas meter. See Figure 7.
Tab on top
Drain slots pointing down
Drain slots towards gas meter
Figure 7: Rear gasket placement on endpoint
2. Place the front gasket on the other side of the endpoint.
a. Place the gasket so that its two holes go over the two protruding tines.
b. Be sure the notched end goes around the guide pin on the right side of the endpoint. See Figure 8.
Page 7 July 2014