Hardware Solutions for Gas Utilities Manual
1. Crimp the splices carefully and completely. Use a parallel jaw crimper, such as a Badger Meter PN: 59983-001.
OTE:N For installation instructions see the Model GAS RT Installation Data sheet.
2. If the gel-cap connections are made at the gas RT unit, carefully tuck the wires and gel caps under the plastic gas RT
cover. Snap the cover back into place.
3. If the gel-cap connections are made at the ORION remote endpoint, tuck the wires and splices up into the
ORION bottom.
4. Place a strain relief onto one corner of the endpoint.
Gas RT
Gel Caps
Snap Cover
Into Place
Gel-Cap Connections
Strain Relief
Gel-Cap Connections
ORIONĀ® Gas Endpoints, Remote Endpoint for Gas Meters and Volume Correctors with Pulsed Outputs
Page 20 July 2013