Full Product Manual

FRONT OF SHED.
• Install second ridge cap 5" back as shown.
Repeat this process until you reach the end of the shed.
37
TOP VIEW
NOTE: THIS IS THE ONLY SHORT 7" RIDGE
CAP, IT WAS SPECIALLY DESIGNED FOR THE
REAR OF YOUR SHED.
USE PROPER ROOF
COATING MATERIAL
AROUND NAILS TO
PREVENT LEAKS.
FRONT OF SHED.
• Install last ridge cap 5" back as shown, it should be flush with the back of your
shed.
• Install 5" Cap as shown. It should be flush with the back of your shed and cover up
the nails from the prior step.
RIDGE CAP INSTALLATION
You have finished your ridge cap.
REPEAT THIS STEP
(25 TIMES)
NOTE: NAILS ARE COVERED BY NEW RIDGE CAPS.
7/8" ROOFING NAIL GALV.
(2 PLS)
ASPHALT SHINGLE 12 x 36
(1 PLS)
FLUSH
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 12
(1 PLCS)
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 7 1/4
(1 PLCS)
7 1/4
5