Full Product Manual
• IF NEEDED BEND EXCESS SHINGLES OVER PEAK BEFORE STARTING ON RIDGE CAPS.
RIDGE CAP INSTALLATION
• INSTALL FIRST RIDGE CAP FLUSH WITH SHINGLES BELOW AS SHOWN.
START AT THE FRONT OF YOUR SHED AND WORK TOWARDS THE REAR.
- 7/8" ROOFING NAIL GALV. - H100446
(58)
TOP VIEW
FRONT OF SHED.
- RIDGE CAP 12
(27)
- RIDGE CAP 7 1/4
(1)
- SHINGLE CAP 5 x 11.75
(1)
36
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 12
(1 PLCS)
WEATHER SEAL
ONE NAIL PER SIDE ABOVE WEATHER SEAL.
1
5 1/2










