Instructions / Assembly
S
H
I
N
G
L
E
S
-
R
I
D
G
E
C
A
P
•
You have finished your ridge cap.
36
FRONT OF SHED.
REPEAT THIS STEP
(15 TIMES)
• Install 5" Cap as shown. It should be flush with the back of your shed and cover up
the nails from the prior step.
WHEN FINISHED USE
PROPER ROOF COATING
MATERIAL AROUND NAILS
TO PREVENT LEAKS.
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 12
(1 PLCS)
NOTE: NAILS ARE COVERED BY NEW RIDGE CAPS.
5
5 1/2
1
• Install second ridge cap 5" back as shown.
Repeat this process until you reach the end of the shed.
• Install last ridge cap 5" back as shown, it should be flush with the back of your
shed.
FRONT OF SHED.
TOP VIEW
NOTE: THIS IS THE ONLY SHORT 9 1/4"
RIDGE CAP, IT WAS SPECIALLY DESIGNED
FOR THE REAR OF YOUR SHED.
7/8" ROOFING NAIL GALV.
(2 PLCS)
9 1/4
FLUSH
FLUSH
SHINGLE CAP 5 x 11.75
(1 PLCS)
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 9.25
(1 PLCS)










