Instructions / Assembly

STEP 23:
SCREW PFH
8x1
(1)
ATTACH MAILBOX BASE TO PICKET FENCE POST
USING (1) 8x1" PFH SCREW.
PRESS MAILBOX BODY INTO INSIDE OF MAILBOX
FRAMES AND ATTACH TO BASE USING (4) MAILBOX
MACHINE SCREWS.
LOCATE MAILBOX REAR DOOR AND SNAP INTO
PLACE INSIDE MAILBOX FRAME. LOCATE MAILBOX
FRONT DOOR AND MAILBOX HANDLE.
ATTACH HANDLE TO MAILBOX FRONT DOOR USING
(1) MAILBOX MACHINE SCREW.
SNAP MAILBOX FRONT DOOR INTO MAILBOX FRAME.
FINALLY, PRESS THE MAILBOX FLAG INTO PLACE ON
THE SIDE OF THE MAILBOX BODY.
MAILBOX FRONT DOOR
MAILBOX HANDLE
MAILBOX MACHINE SCREW
(INCLUDED IN KIT)
ALIGN HOLES
DURING MAILBOX
BODY INSTALLATION.
MAILBOX FLAG
MAILBOX FRAME
MAILBOX FRAME
MAILBOX BODY
SCREW PFH 8x1
(1 PLC)
MAILBOX
REAR
DOOR
MAILBOX BASE
MAILBOX MACHINE SCREW
(INCLUDED IN KIT)
(1) MAILBOX KIT - A6P00017