Instructions / Assembly
10 FOOT SLIDE ASSEMBLY
STEP 4
● ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 2-1/2" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
● REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH 8x2 1/2
(19 PLCS)
SCREW PFH 8x2 1/2
(19 PLCS)
SCREW PFH
8x2 1/2
(38)










