Instructions / Assembly

SP1 - FLOOR SUPPORT CLEAT - W100711
1"x1"x53 3/8" (24x24x1356)
(2)
J2 - END FLOOR CLEAT - W100710
1"x2 3/8"x3 3/8" (24x60x86)
(4)
F71 - STANDARD ANGLE BRACE - W100689
1 3/8"x2 3/8"x13" (36x60x330)
(2)
NUT BARREL
WH 5/16x7/8
(2)
LAG SCREW
W
H 5/16x2 1/2
(2)
BOLT WH
5/16x1 1/2
(2)
WASHER
LOCK EXT
8x19
(4)
WASHER
LOCK EXT
12x19
(2)
SCREW PFH
8x1 1/2
(18)
STEP 7
FIRST ATTACH A F71 BRACE TO A M13 BOARD AND A F71 BRACE TO A L1
B
OARD USING HARDWARE AS SHOWN THROUGH PRE DRILLED HOLE.
PRE DRILL WITH 3/16" BIT AND ATTACH THE F71 BRACES TO E2 BOARDS.
ATTACH A SP1 BOARD TO M13 BOARD AND L1 BOARD RESTING ON F71
BRACES. USING HARDWARE AS SHOWN THROUGH PRE DRILLED HOLES.
ATTACH J2 BOARDS TO EACH E2 BOARD AND TO THE E1 AND E3 BOARDS. THE
TOP OF THE J2 BOARDS SHOULD BE FLUSH WITH THE TOP OF THE SP1
BOARDS. ATTACH THROUGH PRE DRILLED HOLES WITH HARDWARE SHOWN
.
BOLT WH 5/16x1 1/2
(2 PLCS)
WASHER LOCK EXT 8x19
(2 PLCS)
WASHER LOCK EXT 12x19
(2 PLCS)
NUT BARREL WH 5/16x7/8
(2 PLCS)
J2
E1
SP1
M13
F71
E2
E2
E3
L1
FLUSH
VERIFY THAT FORT IS
S
TILL SQUARE, BEFORE
FASTENING F71 BOARDS
TO E2 BOARDS
LAG SCREW WH 5/16x2 1/2
(2 PLCS)
WASHER LOCK EXT 8x19
(2 PLCS)
SCREW PFH 8x1 1/2
(18 PLCS)
45 13/16"