Instructions / Assembly
STEP 7
STAND UP UPRIGHT
ASSEMBLIES AND ATTACH
(2) K2 GROUND BOARDS TO
E1 FORT UPRIGHTS USING
2" LAG SCREWS AND LOCK
WASHERS.
STEP 9
ATTACH K4 ARCHED
WALL RAILS TO E1
FORT UPRIGHTS
USING 2" LAG
SCREWS AND LOCK
WASHERS.
K2
E1
E1
LAG SCREW
WH 5/16x2
(8)
WASHER
LOCK EXT
8x19
(8)
WASHER
LOCK EXT
8x19
(4)
LAG SCREW
WH 5/16x2
(4)
LAG SCREW
WH 5/16x2
(8)
WASHER
LOCK EXT
8x19
(8)
SCREW PFH
8x2-1/4
(8)
M5
M5
E1
E1
STEP 8
ATTACH (2) M5 FLOOR
SUPPORTS TO E1 FORT
UPRIGHTS USING 2" LAG
SCREWS AND LOCK
WASHERS.
K4
K4
M2
M2
H1
H1
E1
E1
PILOT DRILL USING 1/8"
BIT (USE HOLES IN TARP
SUPPORTS AS GUIDE).
ATTACH M2 TARP
SUPPORTS TO E1 FORT
UPRIGHTS USING 2-1/4"
WOOD SCREWS.
K2 - GROUND BOARD - W102298
5/8"x5 1/4"x52 1/2" (16x134x1334)
(2)
M5 - FLOOR SUPPORT - W102309
5/8"x3 3/8"x30" (16x86x762)
(2)
K4 - ARCHED WALL RAIL - W102306
5/8"x5 1/4"x30" (16x134x762)
(2)
M2 - TARP SUPPORT - W102337
5/8"x3 3/8"x31 7/8" (16x86x810)
(2)










