Instructions / Assembly
Fort Assembly
Phase 25
Parts needed:
• (1) BENCH ASSEMBLY
Hardware needed:
• (2) B - NUT BARREL 5/16x5/8 - H100004
• (2) AD - WASHER LOCK EXT 12x19 - H100031
• (2) CM - BOLT WH 5/16x1/2 - H100115
Phase Notes
• Assemble with hardware as shown.
Step 1:
Pilot drill with 10mm drill bit and
attach the Bench Assembly to 'K2' Base
Board using Bolts 'CM', Washer 'AD' and
'B' Barrel Nut, as shown. Repeat the same
process to complete the assembly on the
opposite side.
CM
K2
EJ
AD
B










