Instructions / Assembly

Parts needed:
• (2) M7 - WALL BOARD - W100579
• (9) M11 - WALL BOARD - W100583
• (1) SR - 'B' REVISION TAG - A100315
Hardware needed:
• (46) BR - SCREW PFH 8x1-1/8 - H100088
• (2) CY - SCREW PWH 8x5/8 - H100128
Fort Assembly
Phase 13
M7
M11
M7
BR
BR
K3
M8
K2
BR
Phase Notes
• Assemble with hardware as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 1: Attach 'M7' Wall Boards to
'K3' Arched Wall Board, 'M8' Wall
Rail and 'K2' Base Board using
screws 'BR', as shown.
Step 2:
Attach 'M11' Wall Boards to 'M8' Wall
Rail and 'K2' Base Board using screws 'BR', as
shown.
Note: Due to the changing size of the wood
as a result of moisture content, you may
need to adjust the spacing of your wall slats
1/16" to 1/8" when assembling walls. It would
be best to line up the boards on the wall
before attaching to estimate if a larger or
smaller gap is needed.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
1 9/16"
SR
CY
Step 3: Attach 'SR' Revision
Tag to 'M11' Wall Board using
screws 'CY', as shown.