Instructions / Assembly

Fort Assembly
Phase 7
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) M12 - WALL RAIL - W101731
• (2) M9 - WALL RAIL - W101496
• (2) M13 - WALL RAIL - W101500
• (1) L4 - CLUB HOUSE WALL RAIL - W101491
• (2) M8 - WALL RAIL - W101454
• (1) M10 - WALL RAIL - W101494
Hardware needed:
• (12) H - BOLT WH 5/16x1-1/2 - H100010
• (22) AC - WASHER LOCK EXT 8x19 - H100030
• (12) AD - WASHER LOCK EXT 12x19 - H100031
• (12) D - NUT BARREL WH 5/16x7/8 - H100005
• (10) Z - LAG SCREW WH 5/16x2 - H100027
Step 1:
Attach 'M9' Wall Rails to 'E5'
Club House Legs and 'E2' Tower
Legs using Bolts 'H', Washers 'AC' &
'AD' and Nut Barrel 'D', as shown.
Step 2:
Attach 'M8' Wall Rail to
ends of 'E2' Tower Legs using Lag
Screws 'Z' and Washers 'AC', as
shown.
Step 5:
Attach 'M8' Wall Rail to 'E3'
Tower Legs using Lag Screw 'Z' and
Washer 'AC', as shown.
H
AC
AC
AD
D
M9
Z
AC
AC
L4
E5
D
AD
AC
H
M8
D
AD
M10
AC
H
AC
Z
E2
D
AD
E5
M13
Z
AC
H
AC
M10
Z
AC
M8
E3
E3
M9
M12
M13
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
E2
Step 3:
Attach 'M10' Wall Rail to 'E2' Tower Leg &
'E5' Club House Leg using Bolts 'H', Washers 'AC' &
'AD' and Nut Barrel 'D', as shown.
Step 4: Attach 'M13' Wall Rails to 'E5' Club
House Legs using Lag Screws 'Z' and
Washers 'AC', as shown.
Step 6:
Attach 'M12' Wall Rail to
'E2' Tower Leg & 'E5' Club
House Leg using Bolts 'H',
Washers 'AC' & 'AD' and Nut
Barrel 'D', as shown.
Step 7:
Attach 'L4' Club House Wall Rail
to 'E5' Club House Legs using Lag
Screws 'Z' and Washers 'AC', as shown.