Instructions / Assembly
Fort Assembly
Phase 5
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (1) H5 - FLOOR JOIST - W102374
• (2) L5 - OUTER FLOOR BOARD - W101486
• (17) M3 - FLOOR BOARD - W102375
Hardware needed:
• (99) CK - SCREW PFH 8x2 - H100111
Step 1:
Attach 'L5' Outer Floor Board
to 'J1' Floor Supports using Screws
'CK', as shown.
L5
CK
M3
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 2:
Attach 'M3' Floor Board to
'H1' & 'H2' Floor Rails using Screws
'CK', as shown.
H2
H1
Step 3:
Attach 'H5' Floor Joist to the center of
'M14' wall rails using Screws 'CK'. Next, secure
floor boards to 'H5' Floor Joist using 'CK', as
shown.
Note:
Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
M14
CK
CK
CK
H5










