Installation Guide
It is critically important that you start with square and level footings, concrete pad or deck to
attach your structure
• Pay close attention to the items needed for each step. Make sure you are using the correct hardware for each step.
Using incorrect hardware may result in improper assembly
• Remember to double check for underground utilities and overhead electrical lines
Owner's Manual
Basic Setup Dimensions & Assembly Notes
Post mounts are provided with your structure which allows you to permanently install your structure to a
pre-e
xisting or new wood or concrete surface.
• The hardware to attach the post mounts to the structure is included.
• The hardware to mount the structure permanently to a concrete surface is included.
• The hardware to mount the structure permanently to a wood deck is NOT included and will need to be purchased
separately. You must ensure there is ample structural support under the deck before permanently attaching.
10'-2 3/4"
[3.1
m]
7
'
-
2
3
/
4
"
[
2
.
2
m
]
9'-4 3/4"
[2.9 m]
1'-6"
[.5 m]
CUSHION
1'-1"
[.3 m]
FRAME
2'- 1/2"
[.6 m]
ARM REST
2'-4"
[.7 m]
TABLE
7'-7 1/2"
[2.3 m]
12'-7 1/4"
[3.8 m]
7'-6 1/4"
[2.3 m]
10