Specifications

Instructions 77-9045 Bacharach, Inc. Page 1-5
CD3 AUDIT KIT INTRODUCTION
1.4 PRE-AUDIT CHECKLIST
All responses to the following checklist should be
“YES”.
Pre-audit Checklist
Calibration Fluid Reservoir Cleaned
New Calibration Fluid Filters*
New Calibration Fluid in Reservoir*
Calibration Fluid Reservoir Full*
New “O” Ring in Fuel Arm*
Intensifier Reservoir Full*
Cam Box Oil Changed*
Cam Box Oil Level Normal*
No Leaks in Calibration Fluid Systems
Foreign Objects Removed From Work Area
Air Supply Connected*
Water Supply Connected*
Flowmeter Transducer Reservoir Filled*
Electrical Supply Correct for the Calibrator being
Audited (check the Nameplate)*
Fresh Batteries Installed in clamp force and tem-
perature indicator
*These procedures are in the instruction manual
for the CD3 Calibrator (part 67-9319).
YES NO
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____
_____ _____