Specifications
GDC-350 Operation Manual
5909-9000 Rev 3 15
3.11. Installation Example 3: Type “D” with On-Board and Remote
Sensors
Figure 3-9. Sample Type “D” Installation
Remote Catalytic or
Solid State Sensor
In this installation, the remote sensor
is for a heavier-than-air gas (such as
Propane or a solid state refrigerant gas)
and should be installed 6” from the floor
or near the most likely leak area.










