Hardware manual
AGR Series Stage Hardware Manual Installation
Chapter 2: Installation
This chapter describes the installation procedure for the AGR stage, including handling the stage, preparing
the mounting surface to accept the stage, securing the stage to the mounting surface, attaching the payload,
and making the electrical connections.
W A R N I N G: AGR installation must be in accordance to instructions provided by this manual
and any accompanying documentation. Failure to follow these instructions could result in injury
and damage to the equipment.
2.1. Unpacking and Handling the Stage
Carefully remove the AGR from the protective shipping container. Before operating the AGR, it is important
to let the AGR stabilize at room temperature for at least 12 hours. Allowing the AGR to stabilize to room
temperature will ensure that all of the alignments, preloads, and tolerances are the same as they were when
tested at Aerotech. Use compressed nitrogen or clean, dry, oil-less air to remove any dust or debris that has
collected during shipping. Set the AGR on a smooth, flat, and clean surface.
Each AGR has a label listing the system part number and serial number. These numbers contain information
necessary for maintaining or updating system hardware and software. Locate this label and record the
information for later reference. If any damage has occurred during shipping, report it immediately.
W A R N I N G: Make sure all moving parts are secure before moving the AGR. Unsecured
moving parts may shift and cause bodily injury.
W A R N I N G: Lift the AGR only by the base. Improper handling could adversely affect the
AGR’s performance.
www.aerotech.com Chapter 2 19